Testing of instrument transformers
Our WM series measuring bridges are suitable for testing both conventional and electronic converters and non-conventional digital converters. The WM1000 and WM3000 bridges are primarily used to compare the secondary signals of the measuring transformer with the reference signal of a standard transformer.
The electronically compensated burdens are used to load instrument transformers during testing. Choose between components for manual or automatic testing, as well as fixed or variable burden levels.
All components can be individually integrated into existing CT/VT testing systems. Customized solutions represent our core competency.